Sorry, we didn’t find any maintenance manager jobs in the Edmonton Region on Job Bank. You can see where the jobs are for all Non-destructive testers and inspection technicians (NOC 70012) elsewhere in Canada, or search for another occupation.
AgriFORCE Growing Systems Ltd. has launched agricultural operations at its newly acquired Bitcoin mining facility in Sturgeon County near Edmonton. The facility, powered by an on-site generator, utilizing flared gas, integrates carbon capture and heat reuse technologies to support the cultivation of crops and aquaculture.
- Job creation
-
Agriculture, forestry, fishing and hunting
-
Added on 2024-12-05
-
Edmonton Region, AB
- globenewswire.com
The University of Alberta has reopened the Rehabilitation Medicine satellite program at its Augustana campus in Camrose.
- Job creation
-
Educational services
-
Added on 2024-11-28
-
Edmonton Region, AB
- ualberta.ca
Agfinity, a grain broker based in Stony Plain, laid off employees and initiated bankruptcy proceedings in mid-October. However, according to the company's president, an official bankruptcy filing has not yet been made.
- Layoff
-
Agriculture, forestry, fishing and hunting
-
Added on 2024-11-19
-
Edmonton Region, AB
- producer.com
The Government of Canada is negotiating with the Edmonton International Airport for a new home for the Western Main Operating Base for the Strategic Tanker Transport Capability Project. The location is expected to include a hangar, operations, maintenance, logistics/warehousing, and training and administrative spaces to support RCAF operations for the CC-330 Husky aircraft.
- Job creation
-
Public administration
-
Added on 2024-11-12
-
Edmonton Region, AB
- canada.ca
FlixBus is providing new bus services between The University of Alberta's Augustana Campus in Camrose and Edmonton in a six-week pilot project.
- Job creation
-
Transportation and warehousing
-
Added on 2024-10-26
-
Edmonton Region, AB
- cbc.ca
The Government of Alberta is providing $2.8M through Emissions Reduction Alberta to Varme Energy to support an engineering and design study for a waste-to-energy facility. The facility is expected to begin operations in 2027, when it will capture and store about 185K tonnes of carbon dioxide per year.
- Job creation
-
Construction
-
Added on 2024-09-10
-
Edmonton Region, AB
- alberta.ca